A customer required us to measure up the pipe in Hong Kong and then deliver and fit a new PE coated DN400 reducer T-pipe 2 days later in Nansha, China. Job completed on-time and per quotation. Frequently, when a pipe requires urgent renewal, the only possible solution is to replace it with an uncoated pipe. This means the pipe will need to be replaced again within a year. With our in-house coating and fabrication capability, Irwin Marine is able to do the job right, the first time, even with short lead times. The result is savings for our customers.
News Article
Renewal of DN400 PE Coated Seawater Pipe in Two Days
Services
Pipe Fabrication
Polyethylene(PE) Lining
Refurbishment
3D Desgin & Automet® Survey
We Are Providing Full services:
- PIPE FABRICATION
- PE LINING & REFURBISHMENT
- METROLOGY AND PRECISION